Commission is fine IF they sign a contract.
I would say in the contract the location is liable for ALL damages to the machine. I would also not agree to a % until the machine has been placed for at least a month so you know how much that location is capable, then enter talks with the location on a percentage.
DJ-Sound
Member Since 10 Aug 2008Offline Last Active Aug 19 2008 11:16 AM


Find content
Not Telling

